# Tin Can Making Machine Maintenance: Complete Preventive Maintenance Guide for Production Lines
—
## Key Takeaways
– **Unplanned downtime** in metal packaging manufacturing costs **$4,000–$30,000+ per hour** in lost production, with cascading effects on delivery schedules and scrap rates (Source: **ABB Value of Reliability Survey, 2023**).
– A structured preventive maintenance (PM) program can **reduce unplanned downtime by 30–50%** and extend critical component life by 2–3x vs. reactive approaches (Source: **Siemens True Cost of Downtime Report, 2024**).
– **OEE (Overall Equipment Effectiveness)** — Availability × Performance × Quality — directly reflects maintenance discipline; internationally recognized benchmarks target ≥85% for discrete manufacturing, yet most can lines operate between 60–75% (Source: **Dal et al., International Journal of Operations & Production Management**).
– The three highest-impact maintenance points on a can line are the **welder electrode system**, the **seaming roll profile**, and the **lubrication regimen**.
– This guide provides tiered PM schedules (daily through annual), equipment-specific protocols, spare parts management logic, and a diagnostic framework adaptable to round can, square can, and specialty can lines.
—
## Introduction
Metal can manufacturing is a high-cadence, precision-forming process. A single production line running at 35–60 cans per minute (CPM) — as standard for modern [automatic can making machines](/how-to-choose-automatic-can-making-machine-china-2026/) — processes thousands of units per shift, with every can required to meet dimensional tolerances of ±0.1 mm on seam geometry, weld integrity, and coating continuity.
When a seamer drifts out of specification or a welder electrode wears beyond its service window, the consequences extend far beyond a few bad cans. A deteriorating double seam can produce hundreds of leakers before an operator notices. A worn electrode wheel generates inconsistent weld penetration invisible until downstream pressure test failure. And when a critical machine fails without warning, the entire line stops — sometimes for hours while spare parts are sourced.
This article is the fifth in a technical series from **Jiujiang Yongxin Can Equipment Co., Ltd.**, complementing earlier guides on [double seam quality control](/double-seam-quality-control-tin-can-china-2026/), [tin can body welding technology](/tin-can-body-welding-technology-china-2026/), [tin can internal coating technology](/tin-can-internal-coating-technology-china-2026/), and [tinplate vs. TFS steel substrate selection](/tinplate-vs-tfs-steel-substrate-selection-china-2026/). Where those articles addressed process parameters, this guide translates them into daily, weekly, monthly, seasonal, and annual maintenance actions.
Equipment specifications referenced herein are drawn from Yongxin’s product catalog — covering [rectangular can making machines](/rectangular-can-making-machine-china-2026/), round can lines, [chemical tin can making machines](/chemical-tin-can-making-machine-china-2026/), and food can sealing equipment. The guidance applies equally to single-machine installations and fully integrated [production line](/production-line/) configurations.
The target audience for this guide includes production line equipment supervisors, maintenance team leads, and purchasing managers evaluating supplier after-sales capability. Whether you operate a 30 CPM [square can line](/rectangular-can-making-machine-china-2026/) or a 600 CPM food can sealing system, the maintenance principles are the same — only the specific parameters and intervals change.
*All maintenance intervals and component life estimates are industry-typical ranges. Actual values depend on operating conditions, material grades, ambient environment, production cadence, and shift patterns. Always verify against your equipment manufacturer’s recommendations and your own operational data.*
—
## 1. Why Preventive Maintenance Determines Production Line Economics
### The True Cost of Unplanned Downtime
According to the **Fluke Corporation 2025 Manufacturing Downtime Survey** (n=600 across US, UK, Germany), **61% of manufacturers experienced unplanned downtime in the past year**, costing the sector up to **$852 million weekly** globally at an average of **$1.7M/hour** across sectors. For food and beverage specifically, **ABB (2023)** places hourly downtime cost at **$4,000–$30,000/hour**.
| Cost Component | Typical Share |
|—|—|
| Lost production output | 40–55% |
| Idle labor | 10–15% |
| Scrap and rework | 10–20% |
| Expedited parts shipping | 5–10% |
| Overtime recovery | 10–15% |
| Contractual penalties | 5–15% |
*Source: Industry estimates from **Siemens True Cost of Downtime 2024** and **ABB 2023**.*
For a mid-size plant running a 30–35 CPM square can line (such as the Yongxin 1–5L standard line, 18 kW total power), an 8-hour unplanned stop represents roughly **7,200–8,400 unproduced cans** at rated speed.
### PM Investment vs. Downtime Cost
**Siemens (2024)** estimates a **$4–$10 return per $1 spent on preventive maintenance**. A set of replacement seaming rolls costs a few hundred dollars and takes 30–60 minutes during a planned changeover. An unplanned seamer failure from worn rolls can halt the line for 4–8 hours — at many times the roll cost.
### The Maintenance Maturity Curve
| Stage | Approach | Typical OEE |
|—|—|—|
| **Reactive** | Fix when broken | 40–60% |
| **Preventive** | Service at fixed intervals | 65–75% |
| **Predictive** | Monitor and act on condition | 75–85%+ |
### OEE: The Maintenance Scorecard
OEE = **Availability × Performance × Quality**. Each component links directly to maintenance:
– **Availability** drops with unplanned breakdowns — PM prevents failures
– **Performance** erodes through worn bearings, degraded lubrication, misaligned guides — PM restores rated speed
– **Quality** deteriorates when rolls wear, electrodes develop flats, or coatings fail — PM catches drift before scrap
Internationally recognized targets (per **Dal et al., 2000** and **ISO 22400-2:2014**): Availability ≥90%, Performance ≥95%, Quality ≥99%, yielding OEE ≥85%. Facilities can move from 55–70% to 75–85% within 12–18 months of structured PM implementation, per **McKinsey operations data (2024)**.
—
## 2. Key Equipment on a Can Production Line and Failure Weighting
### 2.1 Equipment List with Failure Profiles
| Equipment | Typical Specs (Yongxin) | Common Failure Mode | MTBF Range* | Single-Point? |
|—|—|—|—|—|
| **Slitting Machine** | Manual: 1.1 kW; Auto: 4 kW, 20–24 strokes/min | Blade wear, feed jam | 2,000–5,000 hrs | Partial |
| **Body Roller** | Material thickness 0.16–0.4 mm | Roll wear, bearing failure | 3,000–6,000 hrs | Yes |
| **Welder** | Small: 18 KVA, 20–40 CPM; Large: 125 KVA, 40–100 CPM | Electrode wear, cooling fault | 500–2,000 hrs | **Critical** |
| **Flanger** | Small sq: 3 kW, 15–20 CPM; Large round: 20–30 CPM | Slot wheel wear, cam fatigue | 3,000–6,000 hrs | Yes |
| **Beader** | Small: 2.2 kW, 12–17 CPM; Auto round: 3 kW, 40–60 CPM | Die wear, seal leakage | 3,000–5,000 hrs | Yes |
| **Seamer** | Small sq: 3 kW, 15–20 CPM; Large: 15–18 CPM; Food high-speed: 200–600 CPM | Roll/chuck wear | 1,000–3,000 hrs | **Critical** |
| **Cover Press** | Small sq: 2.2 kW, 12–17 CPM | Die wear, strip feed fault | 3,000–6,000 hrs | Partial |
| **Leak Tester** | Inline detection | Sensor drift | 4,000–8,000 hrs | Partial |
| **Conveyor & Drive** | Belt/chain/roller | Belt wear, chain stretch | 2,000–5,000 hrs | Yes |
| **PLC & Control** | Delta/Omron; servo + VFD | Dust, heat, connector corrosion | 8,000–15,000 hrs | **Critical** |
*MTBF ranges are industry-typical for 2-shift operation. Actual values vary with workload, material, environment, and maintenance quality.*
### 2.2 Criticality Classification
| Level | Equipment | PM Priority |
|—|—|—|
| **A — Line-Stopping** | Welder, Seamer, PLC | Highest — daily checks, frequent PM |
| **B — Line-Limiting** | Flanger, Beader, Conveyor | High — weekly/monthly |
| **C — Quality Drift** | Body Roller, Cover Press, Tester | Medium — monthly/quarterly |
| **D — Support** | Slitter, Auxiliary | Standard — quarterly/annual |
—
## 3. Tiered Preventive Maintenance Schedule
### 3.1 Daily (Operator-Led, ~30 min/shift)
| # | Check Item | Equipment | Acceptance Criteria | Time |
|—|—|—|—|—|
| D1 | Air pressure | All pneumatic | 0.5–0.7 MPa, stable | 2 min |
| D2 | Lubricant levels | Welder, seamer, flanger | Between min/max marks | 3 min |
| D3 | Abnormal noise/vibration | All rotating | No grinding or knocking | 5 min |
| D4 | Safety devices | All machines | E-stop, light curtain, interlocks functional | 5 min |
| D5 | First-piece seam check | Seamer | Per [double seam QC guide](/double-seam-quality-control-tin-can-china-2026/) | 5 min |
| D6 | First-piece weld check | Welder | Visual + peel test per [welding guide](/tin-can-body-welding-technology-china-2026/) | 5 min |
| D7 | Clean work area | All | Remove debris, wipe surfaces | 5 min |
| D8 | Cooling water flow | Welder | Flow meter in spec, no leaks | 2 min |
### 3.2 Weekly (Technician, ~1.5 hrs/line)
| # | Task | Procedure |
|—|—|—|
| W1 | Lubricant top-up | Apply specified lube to each point per Section 7 chart; wipe excess |
| W2 | Belt tension | Deflection 10–15 mm at mid-span; adjust if out |
| W3 | Pneumatic drainage | Drain moisture from air receiver and FRL units |
| W4 | Electrode wheel visual | Check for flats, discoloration, chipping; measure diameter (Section 4) |
| W5 | Seaming roll cleaning | Remove metal dust from grooves with lint-free cloth |
| W6 | Sensor cleaning | Wipe faces; verify detection on SMC/Delta/Omron units |
| W7 | Chain tension & lube | Slack 2–4% of span; oil if dry |
### 3.3 Monthly (Technician + Supervisor, ~4 hrs/line)
| # | Task | Criteria |
|—|—|—|
| M1 | Electrode wheel dress/replace | Dress if flat >0.3 mm; replace if below min diameter |
| M2 | Seaming roll profile | Measure with projector/gauge; replace if wear >0.05 mm |
| M3 | Bearing inspection | Check play, noise, temp (>70°C housing = investigate); re-grease |
| M4 | PLC cabinet cleaning | Vacuum dust; check fans; inspect terminals |
| M5 | Pneumatic seals | Check for leaks; replace weeping seals |
| M6 | Chain/sprocket wear | Replace chain if >1.5% elongation |
| M7 | VFD/servo parameter backup | Archive current parameters; compare to baseline |
### 3.4 Quarterly (Team Lead, ~5–6 hrs/line)
| # | Task | Procedure |
|—|—|—|
| Q1 | Gearbox oil change | Drain, inspect for particles, refill to spec |
| Q2 | Servo/VFD parameter audit | Compare to baseline; investigate drift |
| Q3 | Geometric accuracy | Check parallelism/coaxiality with dial indicator (≤0.05 mm) |
| Q4 | Safety circuit test | Test every E-stop, light curtain, interlock |
| Q5 | Spare parts inventory | Count against minimums (Section 8); reorder gaps |
| Q6 | Insulation resistance | Megger at 500V DC: motors ≥1 MΩ, transformers ≥10 MΩ |
### 3.5 Annual (Major Overhaul, 2–3 planned shutdown days)
| # | Task | Scope |
|—|—|—|
| A1 | Spindle teardown | Seamer/flanger shafts — inspect bearings, measure journals, replace seals |
| A2 | Full seal/bearing replacement | All gearboxes and rotating assemblies regardless of condition |
| A3 | Guide rail inspection | Check wear patterns; re-machine if >0.1 mm |
| A4 | Full electrical insulation | Megger entire system; replace sub-threshold cables |
| A5 | Control system upgrade review | Firmware versions, obsolescence risk assessment |
| A6 | Structural alignment | Machine-to-machine alignment, foundation bolt torque |
| A7 | Calibration | Leak testers, gauges, torque tools — lab or certified reference |
—
## 4. Welder-Specific Maintenance
### 4.1 Electrode Wheel Wear and Dressing
| Parameter | New | Dress Threshold | Replace Threshold |
|—|—|—|—|
| Flat spot depth | 0 mm | >0.3 mm | >0.8 mm |
| Surface finish | Ra 0.8–1.6 μm | Ra >3.2 μm | Pitting or delamination |
| Diameter loss | 0 | — | >10–15% from new |
| Dress interval | N/A | Every 5,000–15,000 welds (typical) | When dressing won’t restore profile |
*Dress intervals vary with tinplate vs. TFS, material thickness (0.16–0.42 mm across Yongxin’s range), and welding current.*
**Dressing procedure:** Remove wheel → mount on lathe using bore as datum → light facing cut (0.1–0.3 mm) → finish with P400–P600 abrasive → measure diameter → record in log → discard if at minimum.
### 4.2 Copper Wire Electrode System
Wire diameters per Yongxin specs: 1.35/1.5/1.7 mm (large welder, 125 KVA); 1.38/1.5 mm (small welder, 18 KVA).
| Check Item | Frequency | Criteria |
|—|—|—|
| Feed tension | Weekly | Consistent feed, no slip or buckle |
| Feed tube condition | Monthly | No burrs, kinks, or copper dust |
| Contact tip wear | Monthly | Orifice increase <10%; replace if arcing |
| Wire guide alignment | Monthly | Offset ≤0.3 mm |
### 4.3 Cooling Water System
| Parameter | Spec | Check |
|---|---|---|
| Flow rate | 8–15 L/min (typical for 125 KVA circuit) | Daily |
| Inlet temperature | 15–25°C | Daily |
| Water quality | Conductivity <500 μS/cm, pH 6.5–8.0 | Weekly |
| Filter | Clean per pressure differential | Weekly/Monthly |
| Hose integrity | No swelling, cracking, weeping | Monthly |
### 4.4 Transformer and Alignment
| Check | Frequency | Criteria |
|---|---|---|
| Secondary bolt torque | Quarterly | 25–40 Nm (copper bus bar) |
| Transformer insulation | Quarterly/Annual | ≥2 MΩ at 1,000V DC |
| Housing temperature | Daily | Flag if >85°C |
| Electrode parallelism | Monthly | ≤0.1 mm across face |
| Force balance | Monthly | Within 10% between sides |
—
## 5. Seamer-Specific Maintenance
### 5.1 Seaming Roll Profile
Build on the [double seam QC principles](/double-seam-quality-control-tin-can-china-2026/) — roll profile directly determines seam geometry.
**Measurement methods:**
| Method | Accuracy | When |
|—|—|—|
| Profile projector | ±0.01 mm | Quarterly |
| Go/no-go gauge | Pass/fail | Monthly (quick screen) |
| CMM | ±0.005 mm | Annual / roll qualification |
| Replica tape + microscope | ±0.02 mm | Troubleshooting |
**Roll replacement criteria:**
| Feature | Wear Limit |
|—|—|
| Groove radius change | >0.05 mm from nominal |
| Groove depth reduction | >0.05 mm |
| OD loss | >0.3 mm from new |
| Surface finish | Ra >1.6 μm or visible scoring |
| Runout (TIR) | >0.05 mm |
### 5.2 Chuck and Base Plate
| Component | Check | Replace When |
|—|—|—|
| Chuck jaws | Monthly | Visible wear marks; runout >0.1 mm TIR |
| Base plate | Monthly | Scoring; runout >0.1 mm TIR |
| Chuck spring | Quarterly | Grip failure or slippage |
| Coaxiality (chuck-to-base) | Quarterly | Offset >0.05 mm |
### 5.3 Roll Bearing and Teardown Schedule
| Bearing Check | Method | Action Threshold |
|—|—|—|
| Radial play | Dial indicator, monthly | >0.05 mm — replace |
| Temperature | IR gun, weekly | Housing >70°C — investigate |
| Noise | Stethoscope, daily | Grinding/rumbling — inspect immediately |
**Seam teardown frequency:**
| Condition | Frequency |
|—|—|
| Food cans (normal) | Every 2 hrs / 3,000–4,000 cans |
| General line (normal) | Every 4 hrs / 6,000–8,000 cans |
| After roll change or adjustment | First 3–5 cans |
| After material change | First 5 cans |
| After stoppage >30 min | First 3 cans |
—
## 6. Coating System Interface Maintenance
### 6.1 Inline Coating and Curing Equipment
| Component | Task | Frequency | Criteria |
|—|—|—|—|
| Oven temperature uniformity | Multi-point thermocouple survey | Quarterly | ±5°C across usable width |
| Thermocouple calibration | vs. certified reference | Semi-annual | ≤±2°C deviation |
| Heating elements | Visual + resistance check | Monthly | No damage; resistance ±10% of nameplate |
| Exhaust system | Clean fan, check duct buildup | Monthly | Free rotation, no vibration |
| Solvent LEL monitor | Calibrate sensor | Quarterly | ±5% of reference gas |
| Coating applicator rolls | Clean at changeover; inspect surface | Each change | No nicks or damage |
### 6.2 Interface for Offline-Coated Lines
| Check | Frequency | Method |
|—|—|—|
| Incoming coating adhesion | Per batch | Cross-hatch test (ASTM D3359) |
| Coating thickness | Per batch | Film gauge, 4+ positions/can |
| Handling damage | Every shift | Visual at transfer points |
| Transfer point protection | Monthly | Replace worn pads, rails, dead plates |
For coating specifications and substrate interactions, see the [tin can internal coating technology guide](/tin-can-internal-coating-technology-china-2026/).
—
## 7. Lubrication Management
### 7.1 Lubrication Point Schedule
| Location | Lubricant | Frequency | Notes |
|—|—|—|—|
| Seamer roll bearings | EP2 lithium complex grease | Weekly top-up; full purge quarterly | 2–5 g per point; do not over-fill |
| Seamer chuck | ISO VG 68 light oil | Weekly | 3–5 drops per surface |
| Flanger cam followers | EP2 grease | Weekly | Both inner and outer grooves (per Yongxin dual-slot design) |
| Beader die guides | EP2 grease | Weekly | Thin film on sliding surfaces |
| Body roller bearings | EP2 grease | Monthly | 5–10 g per bearing |
| Conveyor chain | ISO VG 150–220 chain oil | Weekly | Light spray, avoid drip |
| Gearboxes | ISO VG 220 or 320 gear oil | Change quarterly | Check for particles in drained oil |
| Linear guide rails | Per rail OEM spec | Monthly | High-precision bearing + linear guide (Yongxin design) |
### 7.2 Food-Grade Lubricant Requirements
For food can lines, use **NSF H1 registered** lubricants wherever incidental food contact is possible. Per **NSF International** and **FDA 21 CFR 178.3570**: H1 lubricants use FDA-approved ingredients, are odorless/colorless/tasteless, with ≤10 ppm base oil migration. Verify via the **NSF White Book**.
**H1 required:** Above or adjacent to open can cavity, seamer rolls, chuck/base plate surfaces, conveyors contacting can interior. **H2 acceptable:** Enclosed gearboxes, motor bearings, chain drives below transport plane.
### 7.3 Common Lubrication Errors
| Error | Consequence | Prevention |
|—|—|—|
| Mixing grease types | Chemical breakdown → bearing failure | Standardize; label grease guns |
| Over-greasing | Overheating → seal damage | Use calculated volume; install relief plugs |
| Under-greasing | Metal-to-metal contact → wear | Follow schedule; use auto-lubricators |
| Greasing dirty fitting | Contaminant injection | Clean fitting first; use covers |
| Non-food-grade in contact zone | Contamination risk | Color-code H1 points |
### 7.4 Lubrication Record-Keeping
Every lubrication event should be logged with: date, technician name, machine and point ID, lubricant type and grade, quantity applied, and any observations (noise, temperature, contamination). This record is essential for tracking consumption patterns — a bearing suddenly consuming 3x its normal grease volume is often developing an internal fault — and for supporting root cause analysis after failures. A simple spreadsheet or CMMS module is sufficient; the key is consistency.
—
## 8. Spare Parts Management
### 8.1 Classification and Stocking
| Category | Examples | Strategy |
|—|—|—|
| **Consumables** | Electrode wheels, O-rings, belts, filters | 1–3 months’ supply |
| **Critical Spares** | Servo motors, PLC modules, VFDs, main bearings | 1 on shelf; 24-hour replacement target |
| **Insurance Spares** | Custom castings, large transformers | OEM delivery SLA; shared consignment |
| **General** | Standard bearings, bolts, seals | Local supplier; min/max levels |
**Safety stock formula:** Minimum Stock = Daily Consumption × Lead Time (days) × Risk Factor (1.0 standard / 1.5 single-source / 2.0 long-lead)
### 8.2 Typical Consumable Life
| Component | Typical Life | Trigger |
|—|—|—|
| Electrode wheel | 10,000–50,000 welds | Diameter below min or surface damage |
| Seaming rolls | 500,000–2,000,000 seams | Profile beyond tolerance |
| Chuck jaws | 1M–3M cycles | Wear marks or grip failure |
| V-belts | 6,000–12,000 hrs | Cracking, glazing, tension loss |
| Pneumatic seals (SMC/Airtac) | 10M–30M cycles | Air leak visible |
| Bearings | 8,000–20,000 hrs | Noise, temp rise, play |
### 8.3 Storage and OEM vs. Aftermarket
| Type | Storage |
|—|—|
| Metal precision (rolls, bearings) | VCI wrap; <60% RH; horizontal for shafts |
| Rubber/plastic (O-rings, belts) | Cool, dark, dry; 3–5 year shelf life |
| Electronics (PCB, servo) | Anti-static; climate-controlled |
**OEM parts** recommended for precision components (seaming rolls, electrode wheels, chucks). **Aftermarket acceptable** for standard items (belts, seals, standard bearings) — verify with incoming inspection. Yongxin uses **Delta, Omron, SMC, Airtac** components, many available from multiple distributors.
---
## 9. Fault Diagnosis and Quick Troubleshooting
**First rule: check the data before acting.** PLC alarm logs, inspection records, and parameter trends are the starting point.
### Symptom: Abnormal Noise
| Cause | Check Steps |
|---|---|
| Bearing failure | Isolate machine; stethoscope; check temperature and play |
| Gear damage | Check oil for particles; listen at housing |
| Loose fastener | Visual + torque check on brackets, cams |
| Pneumatic leak | Listen for hissing; soap bubble test |
### Symptom: Excessive Vibration
| Cause | Check Steps |
|---|---|
| Unbalanced rotating part | Check for buildup; verify balance after dress/replacement |
| Misalignment | Coupling alignment (laser/dial); belt tracking |
| Worn bearings | Radial play; temperature; spectrum vs. baseline |
*For vibration severity on equipment >15 kW, **ISO 20816** (successor to ISO 10816) provides evaluation zones based on RMS velocity at bearing housings.*
### Symptom: Dimension Drift (Can Diameter, Seam Parameters)
| Cause | Check Steps |
|—|—|
| Seaming roll wear (progressive) | Review teardown trend; profile check |
| Chuck/base plate wear | Measure runout; check adjustment |
| Material batch variation | Verify incoming cert and actual thickness |
| Thermal expansion (cold start) | Allow 15–20 min warm-up before first-piece check |
### Symptom: Scrap Rate Spike
| Cause | Check Steps |
|—|—|
| Wrong material | Verify against work order; check thickness |
| Setting changed | Compare PLC parameters to saved recipe |
| Tooling damage | Visual and dimensional check |
| Sensor failure | Verify detection function on all sensors |
### Symptom: Pneumatic Power Loss
| Cause | Check Steps |
|—|—|
| Supply pressure low | Check receiver; compressor; large leaks |
| FRL blocked/adjusted | Drain filter; check regulator; check lubricator |
| Valve failure | Listen for solenoid click; check electrical; manual override |
| Cylinder seal | Listen for internal bypass; disconnect load test |
### Symptom: PLC Alarm
| Step | Action |
|—|—|
| 1 | Record exact alarm code + timestamp |
| 2 | Check alarm history (last 20 events) |
| 3 | Cross-reference OEM manual |
| 4 | Check associated sensors and I/O |
| 5 | Do NOT reset without identifying root cause |
—
## 10. Building a Maintenance System from Scratch
### 10.1 Implementation Roadmap
| Step | Activity | Duration |
|—|—|—|
| 1. Equipment Register | List every machine: make, model, serial, specs | 1–2 weeks |
| 2. Criticality Ranking | Classify A/B/C/D per Section 2.2 | 1 week |
| 3. PM Task Library | Define all tasks per machine from OEM + this guide | 2–4 weeks |
| 4. Schedule | Map to calendar: daily through annual | 1–2 weeks |
| 5. Record System | Forms for completion, findings, parts, follow-up | 1 week |
| 6. Spare Parts Audit | Compare inventory vs. Section 8 stocking logic | 1–2 weeks |
| 7. Training | Operators, technicians, leads by level | 2–4 weeks |
| 8. Launch + Review | Weekly review first month, then monthly | Ongoing |
### 10.2 Team Capability Development
| Skill Level | Competency | Training Approach |
|—|—|—|
| **Operator (Level 1)** | Daily checks, cleaning, first-piece inspection, abnormality detection | On-the-job + visual work instructions at each station |
| **Technician (Level 2)** | Weekly/monthly PM, component replacement, basic fault diagnosis | OEM training + mentoring + hands-on practice |
| **Team Lead (Level 3)** | Quarterly/annual overhaul, geometric accuracy, PM optimization, root cause analysis | Advanced OEM training + reliability engineering fundamentals |
| **Planner** | PM scheduling, spare parts, KPI tracking, budgeting | CMMS training + maintenance management course |
### 10.3 Maintenance KPIs
| KPI | Formula | Target |
|—|—|—|
| **MTBF** | Operating hours ÷ failures | >1,000 hrs (critical equipment) |
| **MTTR** | Repair hours ÷ repairs | <2 hrs (critical equipment) |
| **PM Compliance** | Completed ÷ scheduled × 100% | ≥90% |
| **Planned Ratio** | Planned hrs ÷ total hrs × 100% | ≥70% |
| **Spare Parts Turnover** | Annual consumption ÷ avg inventory | 2–4x/year |
| **Repeat Failures** | Same-machine failures within 30 days ÷ total | <10% |
### 10.3 OEM Collaboration
| Element | What to Agree |
|---|---|
| Remote support | Response within 4 business hours |
| Spare parts SLA | Critical spares available 10+ years; 48-hour shipping |
| On-site service | Engineer dispatched within 72 hours for critical issues |
| Training | 5-day initial + annual refresher available |
| Documentation | Full English package; firmware updates for equipment lifetime |
Contact details and service information available on the [contact page](/contact-us/) and [about us](/about-us/). For the full equipment range, visit the [production line](/production-line/) page.
---
## FAQ
### 1. How often should I change welding electrodes?
Typically every **5,000–15,000 welds** for dressing and full replacement when diameter drops below OEM minimum (usually after several dress cycles). For Yongxin's large welder (125 KVA, wire 1.35–1.7 mm), dress when flat spots exceed 0.3 mm. Monitor diameter weekly.
### 2. How do I know when seaming rolls need replacement?
Replace when: groove wear >0.05 mm from nominal, OD loss >0.3 mm, surface Ra >1.6 μm with visible scoring, or runout >0.05 mm TIR. Also replace if seam teardown parameters drift beyond adjustment correction. Typical life: 500,000–2,000,000 seams.
### 3. What spare parts should I stock?
Minimum: (1) electrode wheels for welder, (2) seaming roll sets per can size, (3) O-ring/seal kits for all cylinders, (4) V-belts for drives, (5) spare proximity sensors matching installed types, (6) filter elements, (7) standard bearings for seamer/flanger/beader. See Section 8 for stocking logic.
### 4. Why does my can diameter drift during production?
Usually progressive: (1) seaming roll wear, (2) chuck jaw wear, (3) base plate misalignment, (4) material batch variation, or (5) thermal expansion during warm-up. Start by checking roll profile measurements against baseline records.
### 5. How do I check oven temperature uniformity?
Multi-point thermocouple survey across the oven width at can height — minimum 9 points (3×3 grid) after steady state (30–60 min). **±5°C** across usable width is the typical industry practice target. Perform quarterly and after element replacement.
### 6. What lubricant for food contact area machinery?
Use **NSF H1 registered** lubricants per **FDA 21 CFR 178.3570** — odorless, colorless, tasteless, ≤10 ppm migration. Verify on the **NSF White Book**. For no-possible-contact areas (enclosed gearboxes), H2 lubricants are acceptable.
### 7. How do I reduce unplanned downtime?
In order of impact: (1) daily operator checks, (2) enforced weekly/monthly PM, (3) critical spare parts stocked, (4) failure data tracking for targeted fixes, (5) condition monitoring on welder and seamer. Per **McKinsey (2024)**, structured OEE management reduces costs by up to 25%.
### 8. What is a reasonable MTBF for a can line?
Well-maintained: welder 500–2,000 hrs, seamer 1,000–3,000 hrs, flanger/beader 3,000–6,000 hrs. Line-level target of **>500 hours** (failure roughly every 2–3 weeks on 2-shift operation) is reasonable for a mature PM program. Higher-performing operations push above 1,000 hours.
### 9. How often should I perform teardown seam inspection?
Food cans: every 2 hrs or 3,000–4,000 cans. General line: every 4 hrs or 6,000–8,000 cans. Plus after every roll change, adjustment, material change, or extended stoppage. Increase frequency if Cpk <1.33. ### 10. Can I use the same grease for all bearings? Not recommended. Different bearing types need different properties, and **mixing incompatible greases** causes breakdown. Standardize on two types maximum and ensure compatibility. Label all grease guns clearly. ### 11. How do I set up PM from zero? Follow the 8-step roadmap in Section 10.1: equipment register → criticality ranking → task library → schedule → records → spare parts audit → training → launch. Operational within **6–10 weeks** for a single line. ### 12. What maintenance KPIs should I track? Minimum five: MTBF, MTTR, PM Schedule Compliance (≥90%), Planned vs. Unplanned Ratio (≥70%), and Maintenance Cost per Unit Produced. Add repeat failure rate and spare parts turnover as the program matures. ### 13. OEM vs. aftermarket spare parts? **OEM** for precision components (rolls, electrode wheels, chucks, custom shafts). **Aftermarket** for standard wear items (belts, seals, standard bearings) — verify incoming inspection. For control components (PLC, servo), OEM is strongly recommended. ### 14. What is the relationship between maintenance and OEE? OEE = Availability × Performance × Quality. PM directly improves all three: prevents breakdowns (availability), maintains rated speed (performance), and keeps tooling in spec (quality). A facility running at 55% OEE with 5,000 scheduled production hours per year wastes approximately 2,250 hours of capacity annually. Structured PM typically moves OEE from 55–65% to 75–85% within 12–18 months (**Dal et al., 2000**; **McKinsey, 2024**). The key is to focus PM effort on the highest-impact failure modes rather than adding generic tasks that consume labor without preventing real problems. --- ## About Jiujiang Yongxin Can Equipment Co., Ltd.
| Item | Detail |
|---|---|
| Company Name | Jiujiang Yongxin Can Equipment Co., Ltd. (九江市永信制罐设备有限公司) |
| Year Established | 2005 |
| Address | No. 005, AnTai Road, Automotive Industrial Park, Jingjika Development Zone, Jiujiang, Jiangxi, China |
| Registered Capital | RMB 1,000,000 (fully paid) |
| Unified Social Credit Code | 91360400775882416D |
| Patents | 86 patents (as of 2026), including invention patents |
| Certifications | National High-Tech Enterprise (GR202536000972, Oct 2025); Jiangxi “专精特新”; ISO 9001 (107325Q1009R0S) |
| Core Range | Automatic lines for round cans (1–25L), square cans (1–20L), flower buckets; standalone equipment; 15–600 CPM |
| Key Components | Delta servo, Omron sensors, SMC/Airtac pneumatics, PLC + HMI |
| Export Markets | Thailand, Vietnam, India, Saudi Arabia, and others |
| Website | canmachine.org |
—
## Related Articles
– [Double Seam Quality Control for Tin Cans (2026)](/double-seam-quality-control-tin-can-china-2026/)
– [Tin Can Body Welding Technology (2026)](/tin-can-body-welding-technology-china-2026/)
– [Tin Can Internal Coating Technology (2026)](/tin-can-internal-coating-technology-china-2026/)
– [Tinplate vs. TFS: Steel Substrate Selection (2026)](/tinplate-vs-tfs-steel-substrate-selection-china-2026/)
– [How to Choose a Tin Can Making Machine Manufacturer (2026)](/how-to-choose-tin-can-making-machine-manufacturer-china-2026/)
– [Chemical Tin Can Making Machine Guide (2026)](/chemical-tin-can-making-machine-china-2026/)
– [Rectangular/Square Can Making Machine Guide (2026)](/rectangular-can-making-machine-china-2026/)
– [How to Choose an Automatic Can Making Machine (2026)](/how-to-choose-automatic-can-making-machine-china-2026/)
– [Flower Bucket Making Machine Guide (2026)](/flower-bucket-making-machine-china-2026/)

*Yongxin fully automatic production line for 1–5L round cans.*